Workshop Progress
0 of 6 deliverables completed
0%
Exercise 6

Next Steps

Assignment Type
Calendar mapping and tactical scheduling
Source Documents Leveraged
  • June-September snapshot timeline from the strategy roadmap
Assignment Instructions

Plot the specific delivery deadlines for upcoming roadshows and proposals directly into a timeline. Assign primary owners and set immediate setup tasks for the NSWC Crane roadshow (Mayumi), St. Cloud roadshow (Yvonne), Prime Contractor Selling event (Matt), Camp Ripley industry day (Anna), Mankato roadshow (Sean), and the Cyber workshop (Alex). Add clear target dates for submitting the LSTR and Accelerator enhancement proposals.

Desired Output

A populated three-month milestone schedule with names and dates attached to every summer deliverable, finalized as Live Deliverable 3.

Live Deliverable 3 — Three-Month Task Tracker

Interactive June–September rollout grid. Adjust task name, primary owner, target date, and status narrative inline.

Task / Deliverable Name
Primary Owner
Target Date
Status Narrative

Tip: each cell auto-saves to local storage. Default milestone names and owners are pre-filled and editable.

Wall Roadmap Visual Upload

Display the final schedule mapped out across the Exchange wall during the event.

Physical Timeline Photo

0 images

Drag & drop whiteboard photos here

or click to browse — JPG, PNG, HEIC